The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps:



1. check the size matching,

2. installation, and

3. testing.


The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!


Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.


Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation of fluency.


When connecting, it is necessary to ensure that the coaxiality between the two is consistent.

If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.


When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.


After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured.

If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation.


When gears or other components are externally installed during transmission, protective devices need to be installed.


After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.


The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.


An installation notice will be provided with each gearbox Motoreducer sells. You can refer to it and make sure it is done according to the right process!




Phone

Phone

17715386183

Address

Address

No.10 Haizhou Road, Binhai Industrial Park, Qidong City, Jiangsu Province

主站蜘蛛池模板: 四虎影院永久网站 | 午夜国产精品福利在线观看 | 天天摸夜夜添狠狠添2018 | 国产一区二区三区美女图片 | 色天天综合色天天天天看大 | 夜夜做日日做夜夜爽 | 日本一本视频 | 又黑又长黑人欧美三级 | 天天操天天干天天摸 | 亚洲 欧洲 日产 韩国在线 | 欧美色人阁 | 国产日韩精品欧美一区色 | 性黄视频| 亚洲精品二区中文字幕 | 68日本 xxxxxxxxx| 亚洲视频免费一区 | 乱码一区二区三区完整视频 | 一本到卡二卡三卡视频 | 久久综合色区 | 五月丁香 | 国产香蕉98碰碰久久人人 | 国产精品四虎 | 特级毛片永久久免费观看 | 奇米影视777四色米奇影院 | 欧美黑人三级 | 欧美熟色妇| 91大神网址 | 91啪免费网站在线观看 | 日本拍拍视频 | 婷婷色网站| 四虎影业 | 欧美午夜色视频国产精品 | 国产69精品久久久久9牛牛 | 狠狠色丁香婷婷第六色孕妇 | 欧色视频 | 91极品女神嫩模在线播放 | 国模吧双双大尺度炮交gogo | 好爽好大www视频在线播放 | 如果我们是季节韩剧在线观看 | 日韩第二页 | 日日摸人人看97人人澡 |